Zoe, the bones held.

You asked me to rip this apart, so I went at it the way a CFO would: I re-ran your math. It reconciles end to end, the counting basis is disciplined, the review gates have dates, and the not-doing list is the most senior thing in either deck. This is strong work. Everything below is about making it land in the room, not about fixing the plan.

If you fix one thing: how the €1.5M path is argued. Right now it quietly requires 3x your win rate, asserted rather than shown. My longest note, on the bridge section, has the two moves: scenario framing, and leading with the twelve-deals path. Everything else is polish, including one honest language pass to scrub the AI tells (second-to-last note on the leadership version).

Your depth question: your instinct is right, and the answer splits by audience. The team version is already at the right depth; I would not add a line. The leadership version is one layer too deep in the middle: leadership reads where-we-stand, the bridge, and the asks, and everything else is reference. Add a 30-second summary up top, move the channel and tier tables to the appendix. The rule I use: a section either changes a decision in the room or it moves to the appendix.

Notes are anchored where they apply. Keep means do not touch it. The room will ask is the question you will get, with the answer to have ready. Outside view is your numbers checked against published benchmarks and public info, with sources linked; the best surprise is in the bridge section. Polish is small stuff before it goes out. Toggle my notes off up top to read your decks clean.

Proud of this one. Let's talk it through whenever you want.  P

Marketing plan · 16 Aug – 15 Dec 2026

Getting marketing at trawa Series B ready by end of year

2,000 MQLs and €23M pipeline by year end. The larger half still has to be generated between now and December.

Owner Zoe
Targets 2,000 MQLs · €23M pipeline sourced · €1.5M revenue sourced
01

Where we stand

The thesis

More volume and better conversion, both in place before the Q4 window.

Pipeline

€15.1M sourced YTD against a €23M year, on a €2.0M-per-month run rate, and 80% of the open pipeline was created this year. H2 has always carried the year — 80% of signed revenue in 2024, 82% in 2025 — so the larger half of the €23M still has to be generated in the next four months.

Conversion

From this quarter MQL→SQL is targeted by intent instead of one flat number: 75% for high intent (a contact request), 50% mid, 25% low. Today those run at 29%, 13% and 5%. High intent has moved — 48% in the last 30 days — mid and low have not, and they are 61% of all MQLs.

MQLs · YTD (input metric)
957
48% of 2,000season-adjusted 1.22×
Season curve says ~785 by now → implies ~2,400, if the H2 ramp repeats.
Pipeline sourced · YTD
€15.1M
66% of €23M659 deals
Deals created in 2026, capped at ≤100 GWh. Q3 is at 250 of the 270 opportunities the ramp plan asks for, at half time. Marketing carries 1,527 of the company's 7,487 GWh in Q3.
Revenue sourced · YTD
€375k
25% of €1.5M62% of the year gone
H1 is historically only ~19% of the year → season-adjusted 0.94×, on curve. 19 wins · 98 GWh.
MetricQ1Q2Q3 (16 Aug)YTDYear-end targetRead
MQLs2575731279572,000H2 ramp must repeat
MQL→SQL (by intent)24%29 / 13 / 5%75 / 50 / 25%Targets by intent tier — new this quarter
Pipeline sourced (≤100 GWh)€3.24M€7.50M€4.38M€15.1M€23MRamp plan level held into Q4; current pace points to €27M
Revenue sourced (closed won)€243k€23k€108k€375k€1,500kOn plan — H1 is historically only ~19% of the year

Pipeline target = the ramp plan carried into Q4 (1,527 GWh/quarter ≈ €5.8M at €3,813/GWh) on top of €10.7M booked in H1. Counting: first touch, closed won, incl. webinar, referral only via friends-refer-friends, all pipeline capped at ≤100 GWh per deal — five deals worth €2.9M sit above the line and are excluded throughout. Derivation in the Notion audit.

Spend vs. pipeline

Marketing spend YTD: €[to add] against €15.1M pipeline sourced — €[to add] of pipeline per euro spent. Cost per MQL and its development over the year are in the appendix.

02

How the €1.5M is reached

€375k is signed. €1,125k has to come out of the open pipeline before 15 December. All figures on the ≤100 GWh basis.

Open marketing pipelineDealsValueRead
Close date Aug–Dec 2026180€5.70M≤100 GWh basis, median €7.2k
— of which Offering stage or later77€2.97MWhere the year is decided
— of which the 12 largest deals12€2.84MHalf the pipeline sits in twelve names
Excluded above 100 GWh5€2.90MNot attainable — not counted anywhere
At the 2026 win rate to date
€382k
6.7% by value (€375k won vs. €5.23M lost this year). The year would land near €757k. This is the do-nothing case.
Required for €1.5M
20% by value
€1,125k out of the €5.70M — roughly 3× the win rate we have run at, or four of the twelve largest deals landing.
Stage-weighted forecast
€1.57M
Standard stage probabilities on the same pipeline. Optimistic against our actual close behaviour, but it shows the target is inside the pipeline, not beyond it.
What we do with this

€1,125k out of €5.70M needs 20% by value — three times this year's rate. Pillar 2 is built to lift exactly that rate: nurture, retargeting, webinars and website CRO, measured per intent tier. Pillar 1 keeps new pipeline coming in behind it. And the twelve largest deals, half the value, get worked deal by deal with sales through the weekly — not as an average.

03

Secure the budget, build conversion, push outbound

Pillar 1 secures the paid budget, pillar 2 builds the conversion lever, pillar 3 pushes the four outbound campaigns. Only the conversion lever is built from scratch; everything else runs on channels that already exist.

1

Secure the Q4 paid budget

Q4 budget for Paid Search and Paid Social in place before W38. Approved in October it arrives after the auction has priced in Q4 demand.

  • Paid carries 820 of the 1,527 GWh marketing owes in Q3 — Paid Search 545, Paid Social 275. Over half the quarter target sits in two channels that stop the moment the budget does.
  • Paid Search carries ~50% of MQL volume and produced 12 of 19 signed wins. Its weekly ramp runs from 23 GWh in W27 to 85 in W37 — that shape only holds if the spend behind it holds.
  • Paid Social holds €611k of open pipe but no wins yet. It is in the budget with a review point, not a free pass.
  • The 2025 Oct/Nov peak was driven by spend: impressions ×8 from Jan to Oct. Repeating the peak requires repeating the spend. Sizing: 2025 Sep–Dec as floor, plus Bing and per-territory query coverage.

Commitments

Q4 budget proposalfollows separately
Paid Search live fromW38
Q4 MQLs (Oct–Dec)≥ 900
Cost per MQL≤ €700
Paid Social review30 Sep — first wins or reallocate
OwnerPhilipp · Zoe (total & result)
2

Build the conversion lever

The portfolio's first conversion lever, built on both ends of the funnel: website CRO on the way in, nurturing and retargeting on the way through, webinars and in-funnel campaigns to convert what is already there.

Intent tierMQLs YTDMQL→SQLTargetLast 30d
High (contact request)29729%75%48%
Mid (solution focused)29213%50%4%
Low (problem focused)1805%25%0%

The gap

61% of MQL volume is mid and low intent, converting at 13% and 5%. The process fixes lifted high intent from 29% to 48% in the last 30 days; mid and low did not move, because nobody works them twice.

What we build

  • Nurture + retargeting. Simon defines which prospect needs what, when — content per funnel stage and industry. Zoe and Philipp build the flows, Furkan takes them over from mid-October. Retargeting runs on the same segments.
  • Webinars & in-funnel campaigns, owned by Anne-Laura. Webinars keep running — the €189k win came from one — plus special campaigns for companies already in the funnel.
  • Website CRO: 2.6% → 3.5%. One point of conversion is ~65 leads a month at zero media spend. Key events are up 95% since the exit-intent popup and secondary CTAs I shipped. An external CRO & tracking contractor, one day a week under Philipp, works the whole site and the GA4/GTM events behind it.

Tier figures are contact-level; SQL was not stamped consistently before this quarter, so the last 30 days are the clean read.

Commitments

Nurture v1 liveby 30 Sep
Retargeting liveby 31 Oct
Webinars & in-funnel campaignsongoing · Anne-Laura
CRO contractor engagedby 30 Sep
Website CR2.6% → 3.5%
Mid + low intent re-engaged≥ 300 MQLs
MQL→SQL by intent tierat target by 14 Nov
3

Get the four outbound campaigns converting

Four campaigns are running right now — cold mail plus calling, the year-end campaign (YEC) against closed-lost, ABM and the Industriestrompreis letters. All pipe-gen without new budget, all still unproven, all gated on 14 Nov.

CampaignQ3 planSent so farStatus
Outbound mail + calling (per territory)60 GWh[# mails]T1 sending since 13 Aug, batch by batch; SDRs calling on top. No conversions yet
Year-end campaign (YEC)100 GWh[# accounts]Running against closed-lost and inactive deals
ABM400 GWh[# accounts]First paid lead 6 Aug; SDR handover fields still missing
Industriestrompreis letters690 GWh[# letters]Letters going out
  • Together these carry 1,250 GWh of Q3 plan — comparable to everything the paid and inbound channels owe combined. ABM and Industriestrompreis sit under Growth in the ramp plan; the execution runs through marketing.
  • They address the same segment as Paid Search without auction cost. Six weeks is enough to establish whether they produce, and none of them carries the base plan until it does.
  • Outbound runs per territory: T1 is live now, the next territories follow — lists and copy ready by 30 Sep. The YEC pushes through to December, so whatever clears the gate scales into the peak without a cold start.

Commitments

ABM handover fields liveby 30 Sep
Outbound reply ratetarget ≥ 3%
First conversionsby 30 Sep
Next territories: lists & copyready by 30 Sep
Gate14 Nov — promote or park, each
OwnersPhilipp (outbound · ABM · ISP) · Simon (YEC)
F

Foundation

Only the items that unblock the three moves. Each has a pipeline reason.

  • Deal Source at creation is done — filled on every new deal since August, first touch as the rule. Still open: source values for ABM, outbound mail and Industriestrompreis, so pillar 3 wins are traceable. No attribution system gets built this year; the GA4 key events get completed by the CRO contractor.
  • Personas consolidated — 6+ competing artefacts exist. Unblocks ABM handover and campaign speed.
  • Referral programme gets a status and an owner. Under the new counting rule it is the only route by which referral revenue counts as marketing. 250+ existing customers.
  • Nothing slips through: every MQL gets contacted and followed up until it moves forward or is disqualified — the routing and follow-up automations make that the default, not a manual sweep. Philipp until mid-October, then Furkan.
  • Minimum hygiene: contacts on won deals corrected, test deals excluded. Without it the funnel views are wrong.

Counting basis

Attributionfirst touch
Revenue sourcedclosed won
Referralfriends-refer-friends only

Commitments

Personas consolidatedBlock 1
Referral owner namedby 30 Sep
Source values ABM / outbound / ISPBlock 1
04

Where the pipeline comes from, channel by channel

The ramp plan splits the 1,527 GWh of pipeline marketing owes in Q3 across channels. Two channels carry more than half of it, and the four campaigns in pillar 3 add another 1,250 GWh on top. The plan ends at W39 — the Q4 split does not exist yet and is a Block 1 deliverable, produced with the budget proposal, since the two decide each other.

ChannelLeverQ3 plan
ramp
ShareOpen pipeSigned YTDRole
Paid SearchPipe545 GWh36%€1.18M€127k (12)Carries MQL volume and the win base
Paid SocialPipe275 GWh18%€611k(0)Pipeline but no wins yet; review 30 Sep
Direct / BrandPipe Brand217 GWh14%€163kThe read-out for brand, since brand is not measured directly
EventsPipe210 GWh14%€772k(0)H2 fully booked (AMB, GDACon, FMB, Motek, BVL, BrauBeviale); remaining lever is follow-up → pillar 2
Organic / SEOPipe120 GWh8%€98k€59kRare but large wins; 4 of 6 money pages open — CRO works the same pages
Year-end campaign (YEC)Conversion100 GWh7%Closed-lost and inactive deals → Pillar 3
Outbound mail + callingPipe60 GWh4%Sending, not yet converting → Pillar 3
WebinarsConversion€405k€189k (1)Largest single revenue source of the year; not in the ramp plan → pillar 2, plus campaigns for in-funnel companies
NurturingConversionDoes not exist yet; Pillar 2 builds it
Marketing total1,527 GWh100%€3.37M€375k20% of the company Q3 plan (7,487 GWh)
ABM · IndustriestrompreisPipe400 · 690GWh count toward Growth's ramp targets, not marketing's 1,527. Execution runs through marketing → pillar 3; they get their own Deal Source values in Block 1 so wins stay traceable
Q4 (W40–W52): not yet split by channel. Built in Block 1 — the season peak sits in it, so the split and the budget have to be decided together.

Lever: Pipe = generates new pipeline · Conversion = converts demand we already have · Brand = awareness, read through the pipe channels. Bet = not yet proven, not counted in the base plan. Q3 plan = ramp plan GWh per lever (W27–W39); the plan file ends there. Open pipe = open deals, new customer, ≤100 GWh, contract start 2027 — a snapshot, not the same figure as pipeline created. Of €21.6M total, marketing holds €3.37M; Partnerships €8.33M and outbound cold calling €6.0M.

05

Timeline: 16 August to 15 December

Three blocks with two review points, 30 September and 14 November. All targets are broken down to weekly numbers and tracked continuously; the reviews are where we re-decide. The plan runs to 15 December.

Block 1 · 16 Aug – 30 Sep

Secure budget, set the system up

Quantitative

  • Q4 paid budget in place before W38
  • Q3 revenue sourced ≥ €250k
  • Tiered MQL→SQL live and reported per intent tier

Qualitative

  • Q4 OKRs set
  • Q4 ramp split by channel, alongside the budget proposal
  • Nurture v1 live, webinar and in-funnel campaign plan set
  • Q4 messaging and enablement briefed to Simon
  • CRO contractor engaged, page baselines set, GA4 key events completed
  • Outbound converting · ABM handover live
  • Personas consolidated · referral owner named
  • Events & generalist hire in process
Block 2 · 1 Oct – 14 Nov

Run the season peak

Quantitative

  • Oct + Nov MQLs at 2025 season share
  • Pipeline sourced YTD ≥ €21M
  • Cost per MQL ≤ €700
  • Each intent tier at or above target for 4 weeks
  • Revenue sourced tracking the 2025 season curve

Qualitative

  • Nurture running across funnel stages and industries · retargeting live
  • CRO changes shipped, website CR trending to 3.5%
  • Webinars and in-funnel campaigns delivered
  • Outbound & ABM gate decided in writing
  • New hire onboarded and producing
Block 3 · 15 Nov – 15 Dec

Close the year, set up 2027

Quantitative

  • MQLs ≥ 2,000
  • Pipeline sourced ≥ €23M
  • Revenue sourced ≥ €1.5M

Qualitative

  • 2027 plan and budget drafted
  • Q1 2027 backlog set
  • Team set up to carry it without me in every loop
06

The team

Setup for Q4

Marketing lead
Zoe
Owns pipeline, ambition level and total budget. Owns nurturing and events until the events hire is onboarded.
Paid & growth
Philipp
Paid Search & Social, allocation inside paid, outbound & ABM. Growth associate and the CRO contractor report here.
Pillar 1 Pillar 3
Brand & website
Anne-Laura
Grows into owning the website and brand — builds pages herself and takes the site off the external partner step by step. Owns webinars and in-funnel campaigns, keeps pushing content and LinkedIn.
Conversion Brand Pillar 2
Product marketing
Simon
Positioning and messaging, personas consolidation, the YEC. Defines which prospect needs what content when — nurture across funnel stages and industries — plus campaign messaging and late-stage sales material. Steered by Zoe, via Tim until end of probation.
Pipe Foundation
Reports to Philipp · signed, full-time from mid-Oct
Growth associate (Furkan)
Builds the automations: routing leads to the SDRs, making sure every lead gets worked, and keeping tracking correct. Carries the HubSpot hygiene package.
Conversion Foundation
Reports to Philipp · contractor, ~1 day per week
CRO & tracking
Conversion across the whole site — forms, CTAs, popups, campaign landing pages and the money pages — plus the GA4 and GTM events behind them. Works with Philipp on paid landing pages and tracking. Time-boxed, not headcount.
Conversion Foundation Pillar 2
Reports to Zoe · open role, L2 · hiring now
Marketing generalist & events
Events end-to-end plus campaign execution. Adds the follow-up capacity Pillar 2 depends on. Onboarded in Block 2.
Pipe

How marketing scales output

Team SLAs · developed with the team, set as ours
Lead time kick-off → output−30%
Topics open at the same time7 → 4
Max duration per milestone2 weeks
Weeklydecisions and milestones, not status
Dailyno 1:1s, no generic check-ins
Before a new topic startsscope check: purpose, who is needed, V1 or V2+

Good enough → out, test, measure. Set in Block 1, reviewed on 30 Sep and 14 Nov.

Who decides what

Priorities currently form in one-to-ones. Each one is right on its own; in sum nobody sees the total load or the dependencies — secondary CTA, money pages and GTM events all arrived that way. Direction and goals come from Tim; sequence and utilisation are mine.

Order when the load is too high

Cut first. Then standard: v1 within days from the information we already have, depth only where money, contract risk or external exposure is involved. Then the weekly on numbers and decisions. Capacity last — headcount is never the first answer.

07

Deliberately not doing

Three moves, one foundation, one hire to onboard and a season peak to run — with four people, one associate and one day a week of external CRO and tracking. That is why this list is as long as it is.

New brand topics & KPIsWe keep posting on LinkedIn and keep the brand tracking we have. No new brand topics or KPIs before January.
Competitive intelligenceLast review was 2025. Not pipe generation, so it waits until January.
InternationalisationPaid Search AT holds this year through the taskforce setup. A proper build is 2027.
New channelsPodcasts, video, executive roundtables, employee advocacy, third-party listings — evaluated, parked. Nothing new before 15 December.
The commitment

Commit to €1.5M, play for more.

Volume and conversion move in parallel: buy the peak, push outbound, and build the conversion lever the portfolio has never had. Everything outside pipeline generation stays deliberately minimal this year. The €1.5M is inside the pipeline — it is reached by converting it. The Q4 paid budget proposal follows separately.

A

Appendix · Spend and efficiency

Q1Q2Q3 (to date)YTD
Marketing spend€[ ]€[ ]€[ ]€[ ]
Cost per MQL€[ ]€[ ]€[ ]€[ ] · guardrail €700
Pipeline per € spend€[ ]€[ ]€[ ]€[ ]

Auction prices rise into Q4 — cost per MQL is steered against the €700 guardrail, not against its own history. Figures to be filled from the budget sheet.

Marketing · 16 Aug – 15 Dec 2026

How we hit 2,000 MQLs and €23M pipeline by year end

This is the plan until 15 December: what we go after, who owns what, and how we work.

Our targets 2,000 MQLs · €23M pipeline sourced · €1.5M revenue sourced
Reviews 30 Sep · 14 Nov
01

What we've already built this year

Worth saying out loud before the push: this is what the same team looked like twelve months ago, and where it stands now.

BeforeNow
MQLs495 in the full year 2025957 by mid-August — 1.9× the whole of 2025, with the strongest months still ahead
Pipeline sourced€15.1M · 659 deals — every sixth euro of trawa's open pipeline is marketing-sourced
Ramp plan250 of 270 Q3 opportunities — at half time
Lead attack time42 days (April 2026, first measured)2.2 days, high-intent leads in ~30 minutes
Leads not contacted108 per month (spring 2026, first measured)5
WebsiteAug 2025: [CR to be added]Key events +95% on 18% more traffic — exit-intent popup and secondary CTAs are converting

And the single biggest marketing win of the year — €189k — came from a webinar we ran ourselves.

02

Five things we act on until December

1

The harvest is in H2 — and we're walking into it stronger than ever

H2 carried 80% of signed revenue in 2024 and 82% in 2025. Buying decisions in our market cluster in autumn, and this year we enter that window with more pipeline, faster response times and more channels live than trawa has ever had.

  • We have the budget to push through the peak — and we keep pushing even if MQLs get more expensive in the Q4 auction. Paid Search and Paid Social carry over half of our Q3 pipeline target.
  • Events H2 is fully booked: AMB, GDACon, FMB, Motek, BVL, BrauBeviale.
2

We don't just generate — we convert

Sales moves the deals — our job is that every lead is worked and warmed until it is deal-ready. MQL→SQL is now targeted by intent — 75% high · 50% mid · 25% low — and today mid and low intent, 61% of our volume, mostly go nowhere after the first touch. That changes now:

  • Nurturing goes live in September. Simon is the brain behind it — he defines which prospect needs what, when, and writes the content per funnel stage and industry. Zoe and Philipp build the first flows; Furkan takes them over from mid-October.
  • Retargeting live in October, against the same segments.
  • Nothing slips through: every MQL gets contacted and followed up until it moves forward or is disqualified — the routing and follow-up automations make that the default.
  • Webinars and in-funnel campaigns — Anne-Laura owns them: webinars keep running (the €189k win came from one), plus special campaigns for companies already in our funnel, built to help them convert.
  • Website conversion gets a specialist — an external CRO & tracking contractor, one day a week, working with Philipp. Target: 2.6% → 3.5%, which is ~65 extra leads a month on today's traffic alone.
3

Outbound aggression

Four campaigns are running right now, and together they carry 1,250 GWh of the Q3 plan:

  • Outbound mail + calling — we go territory by territory: T1 sending since 13 Aug with SDRs calling on top, the next territories follow.
  • Year-end campaign (YEC) — the push against closed-lost and inactive deals. Simon runs it.
  • ABM — first paid lead landed 6 Aug; SDR handover goes live in September.
  • Industriestrompreis letters — going out.

Each one gets measured, and on 14 November we decide per campaign: scale it or park it. The T2 and T3 lists are prepared while T1 runs, so whatever clears the gate scales straight into Q4.

4

We ship fast and stay scrappy

90% and live beats 100% and late. We set our own SLAs together in September — the starting proposal:

  • Lead time from kick-off to output: −30%.
  • Max 4 topics open at the same time, no milestone longer than 2 weeks.
  • Weekly = decisions and milestones, not status. No generic check-ins.
  • Before anything new starts: quick scope check — what's it for, who's needed, v1 or v2+.

And one filter for everything that comes at us from outside: requests go through the ticket system, prioritisation is Zoe's call — so inflow stops pulling anyone off their focus.

5

Blinders on — everything that isn't pipeline waits

We deliberately park good ideas so the four months stay focused.

03

The targets, in numbers

MQLs
2,000
957 so far — ahead of the season curve. October and November are historically our biggest months.
Pipeline sourced
€23M
€15.1M is in. The ramp plan gives us 1,527 GWh per quarter — Q4 keeps that level through the peak.
Revenue sourced
€1.5M
€375k signed. The rest is inside the pipeline we've built — we get it out by converting, together with sales.
MQL→SQL by intentTodayTarget
High intent (contact request)48% last 30d75%
Mid intent (solution focused)13%50%
Low intent (problem focused)5%25%

SQL wasn't stamped consistently before this quarter, so the old numbers understate us — the clean measurement starts now, and thesis 2 is how we hit these.

Who delivers the pipeline — Q3 plan per channel

ChannelQ3 planShare
Paid Search545 GWh36%
Paid Social275 GWh18%
Direct / Brand217 GWh14%
Events210 GWh14%
Organic / SEO120 GWh8%
Year-end campaign100 GWh7%
Outbound mail + calling60 GWh4%
Total1,527 GWh100%

ABM (400 GWh) and Industriestrompreis (690 GWh) run on top — they count toward Growth's targets, we execute them. The Q4 split is set in September together with the budget.

04

Who owns what

Marketing lead
Zoe
Pipeline, priorities and total budget. Owns nurturing and events until the events hire is onboarded.
Paid & growth
Philipp
Paid Search & Social, allocation inside paid, outbound & ABM. Growth associate and the CRO contractor work with him.
Pipe
Brand & website
Anne-Laura
Grows into owning the website and brand — builds pages herself and takes the site off the external partner step by step. Owns webinars and in-funnel campaigns, keeps pushing content and LinkedIn.
Conversion Brand
Product marketing
Simon
Positioning and messaging, personas, the YEC. Carries the nurture content across funnel stages and industries, plus campaign messaging and late-stage sales material.
Conversion Pipe
Signed · full-time from mid-October
Growth associate (Furkan)
Builds the automations: lead routing to SDRs, making sure every lead gets worked, tracking. HubSpot hygiene.
Conversion
Contractor · ~1 day per week
CRO & tracking
Conversion across the whole site — forms, CTAs, popups, landing pages, money pages — plus the GA4/GTM events behind them.
Conversion
Open role · L2 · hiring now
Marketing generalist & events
Events end-to-end plus campaign execution — the follow-up capacity the conversion push needs. Onboarding in October.
Pipe
05

The next four months, in three blocks

Block 1 · until 30 Sep

Everything goes live

What ships
  • Nurture v1 sequences sending
  • Webinar and in-funnel campaign plan set
  • ABM handover to the SDRs live
  • CRO contractor starts, page baselines set
  • Personas consolidated
What we decide
  • Q4 paid budget, before W38
  • Q4 OKRs and channel split
  • Our team SLAs — set together
Block 2 · 1 Oct – 14 Nov

The peak — everything runs

What runs
  • Paid at Q4 level, webinars + in-funnel campaigns, nurture + retargeting on all segments
  • All four outbound campaigns measured weekly
  • New events colleague and Furkan on board
What we hold ourselves to
  • Oct + Nov MQLs at last year's peak share
  • Pipeline sourced YTD ≥ €21M
  • Each intent tier at target for 4 weeks
  • 14 Nov: scale or park, per campaign
Block 3 · 15 Nov – 15 Dec

Close the year

What we land
  • MQLs ≥ 2,000
  • Pipeline sourced ≥ €23M
  • Revenue sourced ≥ €1.5M — together with sales
What we set up
  • 2027 plan drafted
  • Q1 backlog from the parked list
06

Parked until January

New brand topics & KPIsWe keep posting on LinkedIn and keep the brand tracking we have. No new brand topics or KPIs before January.
Competitive intelligenceWaits until January.
InternationalisationPaid Search AT holds this year through the taskforce setup. A proper build is 2027.
New channelsPodcasts, video, roundtables, employee advocacy — evaluated, parked. Nothing new before 15 December.

Anything that lands on your desk and isn't on this plan: into the ticket system, Zoe prioritises.